Laying of two pipelines one kilometer long, 20″ diameter. Right of way preparation, trench excavation & backfilling, pipe sleepers and pipe support foundations pre-casting and installation, laying, testing and heat shrink sleeve installation of pipeline, pipeline tie-in welding and asphalt road repairing.

FTTL TO PAPCO TERMINAL PIPELINES